Baseline the production process
Capture cycle time, defect rate, uptime, staffing and changeovers before evaluating technology.
Integrate with existing systems
Consider material flow, PLCs, quality data and maintenance systems. Physical safety controls must not depend on a network service.
Test the economics
Estimate equipment, integration, training, service and downtime costs. A successful pilot measures total economics under representative demand.
